- cross-posted to:
- canada@lemmy.ca
- cross-posted to:
- canada@lemmy.ca
The train is expected to use a newly built, separate electrified track and run frequently. In addition to Quebec City, Montreal and Toronto, it would serve Trois-Rivières, Laval, Ottawa and Peterborough.
Transport Canada initially estimated that the cost of a high-speed rail link between the two cities could be as high as $80 billion.
It’s expected to take four to five years to design the future high-speed line. Funds are to be allocated at the end of that time period, so it’s possible a future government could modify or cancel the project.
This would be amazing. Can we cancel Ford’s ridiculous $60bn tunnel to fund this instead?