Hi everyone

It’s been a while, I skipped a couple of weeks to get things going on our project!

Last time I wrote we had finished 3 slices of the roof. In the meantime, we finished the 4 next ones and completed the roof.

Eventually we were able to do a complete layer in one day, the second one on top the following day, and move the wooden structure the third day.

We held off laying the last slice to finish the front wall (and be eventually able to attach the ceiling to it), making a door lintel out of cinderblocks and reinforced concrete.

The suspense was high whether we would have enough bricks to finish the project and it turned out we had just 3 extra at the end!

One of the bricks revealed a handwritten signature which turns out to mean “Ludwig Herman”. We are still investigating who and when :)

Next, we will spend many hours cleaning the grout from the inside to free the bricks and make nice regular joints. Then we will insulate the outside with a pond liner and cover the root cellar under a thick layer of dirt.

See you soon!

  • Gorgritch_Umie_Killa@aussie.zone
    link
    fedilink
    arrow-up
    3
    ·
    5 months ago

    That looks really awesome! I’s hoping you’d not stopped posting, or given up on the project when you hadn’t posted in a while. What a fantastic curved ceiling!

    • morgunkorn@discuss.tchncs.deOP
      link
      fedilink
      arrow-up
      1
      ·
      edit-2
      4 months ago

      Thank you so much!

      the Monday when my “weekly” post was due, we had 2 additional layers done, but it was very same-y and not really worth posting, so I thought I’d hold off until we finish the whole thing.