Getting my info from HWMonitor as I can’t find a better option without buying a hardware solution.
CPU: around 15W
DRAM: around 10W
GPU: around 60W if I’m reading that bit right…
Total (and adding a bit for other components and PSU efficiency losses): around 115W
Over a (30 day) month that would be 82.8kWh or £26 a month (actually a bit less than this as I’m on an economy 7 tariff which halves the costs per kWh overnight, I went with worst case as the server uses more energy during the weekend days).
Would be interesting to boot up the old server and check use there, willing to bet a dual Xeon X5670 machine with spinning rust for storage would be far higher than the current Xeon E5 2690 v4 with M.2s in there (a quick Google search indicates 174W for a machine with less hardware than my old server, at idle)
Getting my info from HWMonitor as I can’t find a better option without buying a hardware solution.
CPU: around 15W DRAM: around 10W GPU: around 60W if I’m reading that bit right…
Total (and adding a bit for other components and PSU efficiency losses): around 115W
Over a (30 day) month that would be 82.8kWh or £26 a month (actually a bit less than this as I’m on an economy 7 tariff which halves the costs per kWh overnight, I went with worst case as the server uses more energy during the weekend days).
Would be interesting to boot up the old server and check use there, willing to bet a dual Xeon X5670 machine with spinning rust for storage would be far higher than the current Xeon E5 2690 v4 with M.2s in there (a quick Google search indicates 174W for a machine with less hardware than my old server, at idle)