The grid upgrade can cost millions for a DC fast charging station.

The inverter to make the DC power can cost 100,000.

Why not skip all this and have a diesel engine coupled to a 400V DC generator, thereby skipping the inverter and grid upgrade?

I think this would be cheaper, and lower capex and operational costs. Not to mention, most streets have natural gas lines which could power the diesel engines with a cheap and clean burning fuel. Natural Gas is very cheap around 4c/kwh. A 20% efficient generator, would yield 16c/kwh.

  • GeniusEE@alien.topB
    link
    fedilink
    English
    arrow-up
    1
    ·
    1 year ago

    Because that woupd stop the transition to wind/solar, or at least double the cost of it.